News

Option A: Multi-span bridge at Maitland Street

15 March 2023

  • A 100m long multi-span bridge
  • Shortest pipe length between Jacobstown Wells to the East Gore Water Treatment Plant (1500m), which means less ongoing maintenance costs in the future
  • Requires a cycle/pedestrian pathway in the flood plain
  • Unlikely to encourage more people to bike or walk to school or work and therefore is unlikely to attract Waka Kotahi funding.
  • Estimated cost to the Council: $6.8m to $8m