  • A 90m long, three span bridge.
  • Provides good walking and cycling connections for the community
  • 2950m of pipeline required. This will result in additional ongoing maintenance and pumping costs.
  • Requires a cycle/pedestrian pathway in the flood plain
  • Located in a residential area and would need to be assessed for visual and other impacts
  • Has a high degree of certainty for Waka Kotahi funding. Attracted a 59% funding commitment previously
  • Estimated cost to the Council: $4.45m to $4.55m (assumes 59% Waka Kotahi funding)
Share Option B: Multi-span bridge at Surrey Street on Facebook Share Option B: Multi-span bridge at Surrey Street on Twitter Share Option B: Multi-span bridge at Surrey Street on Linkedin Email Option B: Multi-span bridge at Surrey Street link

We will be looking further into the option of putting the pipelines under the Mataura River. Thanks for taking part in this project.